Lukoil WQ-2 Enerji Santrali Projesi

Our works for West Qurna-2 Project in the scope of agreement signed with ENKA ĠnĢaat ve Sanayi A.ġ are as follow;

  • 3 adet 42MW General Electric MS6001B DLN FuelGasTurbine + Load Gear + Generator ve tüm yardımcı sistemleri montajı
  • Installation of 3 funnel,
  • Installation of 3 Filter House
  • Installation of 3 Lube Oil & Water Cooler
  • Installation of 3 Atomizing Air Cooler,
  • Installation of 3 Local Control Cabinet (LCC),
  • Installation of Fuel Gas Compressors and in addition to these auxiliary equipments installation such as Enclosure, Piperack, Air & Water Cooler,

All of these installations have been completed under GE and ENKA supervisors.

In addition to these Pre- Commissioning and Commissioning works for West Qurna-2 Project;

  • All cold and hot implementation of installed 3 pieces 42 MW GE MS6001 B DLN Gas Turbine + Load Gear+ Generator and auxiliary systems in the scope of agreement have been completed under ENKA POWER team supervisorshi

Görsel

Görsel

Görsel

Görsel

Görsel

Görsel

Görsel

Görsel

Görsel

Görsel

Görsel

Görsel

Görsel

Görsel

Görsel

Görsel

Görsel

Görsel

Görsel

0 cevaplar

Cevapla

Want to join the discussion?
Feel free to contribute!

Bir cevap yazın

E-posta hesabınız yayımlanmayacak. Gerekli alanlar * ile işaretlenmişlerdir