As we are subcontractor of EKON Firm, turn-key electromechanical installation works of gas turbines, steam turbines and generators and auxiliary equipments in 850 850 MWe Gebze Yeni Elektrik Üretim Aġ Central have been completed under the supervision of Ansaldo Energia.

Installation details:

  • Installation of 2 294MW Ansaldo Energia v94.3a(4) model gas türbine and generator with subsystems, installation of ancillary equipment with generator and including air intake system, fogging system 1 Ansaldo Energia RT 30 C model steam turbine
  • Installation of diffuser
  • Whole Piping gas türbin
  • Installation of gas turbine and steam turbine generator rotors
  • Installation of LP turbine in the area
  • Piping of Gas turbine drain lines
  • Main steam lines valves P91 sources
  • Lubeoil, lubeoilcooler, hidrolik oil, liftingoil, pnömatik sistem ve HcOskid montajı
  • Damper Isolation of gas turbine and steam turbine
  • Implementation works
  • Implementation service of gas turbine
    • Implementation service of steam turbine
    • Operation Support service with Ekon
    • A.Ş.
    • Implementation works fır waste water and chemical dosing unit
    • Flushing application of gas turbine , Fin fan Temporary piping works
    • Cleaning of gas turbine and steam turbine lube oil lines
    • Installation of HP and IP valves after steam blow works and steam turbine steam blow
    • Dosing and sampling activities during the implementation of units
    • Disassemble and installation works for calibration of all security valves in system
    • Support service for making spare part lists of valves in all systems
    • All electric termination from all electric lines at internal parts to the panels
    • Enclosure leak test and door fan test
  • Our Firm gives technical maintainance support service to power plant of Yeni Elektrik A.Ş.with the long term maintainance agreement ( LTSA) signed in 2014.

Power plants which have been installed from our established year 2002 to today with Gebze Yeni Elektrik Üretim A.ġ Plant are as follow;

  • As subcontractor of ENKA TEKNĠK 570 570 MW Libya Zwitina Plants electromechanic turn key installation,
  • As subcontractor of PROKON-EKON firm 570 MW Ambarlı Fuel-Oil Plant in the scope of 4th and 5th rehabilitation project electro mechanic turn key installation of gas turbine and auxiliary equipments,
  • As subcontractor of METKA Firm 775 MW DENĠZLĠ RWE-TURCAS natural gas combined cycle plant turnkey mechanic installation of gas turbine and steam turbine groups,
  • As subcontractor of EKON Firm 850 MWe Gebze Yeni Elektrik Üretim Aġ Plant with natural gas combined cycle plant turnkey mechanic installation of gas turbine total 2.740 MW powerplant turbine and auxiliary systems installation.