Our installation works completed as a turnkey project for the conversion and renewal of the 4th and 5th units of the Ambarlı Fuel-Oil Power Plant, which is made by EPP (Ekon, Prokon engineering, Prokon production.) joint venture are as follow;

  • Mechanical, electrical and I & C installation of 2 285 MW Siemens SGT5-4000F type gas turbines and generators have been completed.
  • Air intake, installation of all turbine systems and bearing insulation of gas turbines have been completed under the supervision of Siemens and EPP

In addition to these;

  • Mechanical and electrical installation of 2 33,000 m3 / h capacity Hyosung seawater cooling pumps
  • Hyosung brand high pressure turbine boiler feed water pumps with 4 324 m3 / hour capacity mechanical and electrical installation,
  • Mechanical and electrical installation of 4 units of 90 m3 / h capacity Hyosung medium pressure turbine boiler feed water pumps have been completed under the supervision of Hyosung and EPP
  • 2 Escher Wyss brand steam turbine and valve spraying works have been completed under the supervision of G + H company.
  • Replacement of 11.000 heat exchanger pipes in the condenser, cleaning of casing with pressurized water, epoxy coating of sea water rooms, epoxy coating of outer casing, renewal of condenser fixator springs have been completed.
  • We have given implementation service with commissioning team from the date of installation.

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri