EÜAŞ Afşin Elbistan A Power Plant 3rd unit Alstom steam turbine and generator has been completed under the supervisionship of Alstom Power.

In the scope of maintainance ;

  • Disassembly and maintenance of HP, IP and LP turbines,
  • HP, IP ve LP sabit kanatların bakımları,
  • Maintenance of HP, IP and LP fixed blades
  • Disassembly and maintenance of all turbine bearings,
  • Radyal ve aksiyal kaplin ayarları,
  • Disassembly and maintenance of all turbine valves,
  • Radial and axial coupling settings,
  • Generator disassembly
  • Disassembly and maintenance of Generator bearings ,
  • Disassembly and maintenance of generator cooling lines and hydrogen seals, • Change of generator windings and core, •
  • Production and assembly of clean room before generator winding change,
  • Sandblasting of turbine rotors, fixed blades, valve equipment and other parts,
  • Main lubrication pump maintenance,
  • Maintenance of equipment and pumps in the lubrication system,
  • Isolation of turbine spray insulation and pipelines

All scaffolding works in the area will be done on site