Gas turbines as electricity and I&C assembly work:
- Installation of pressure transmitters,
- Installation of flame detectors and installation of thermocouples,
- Fire detection system installation,
- Electrical connections and cable tests of blow-off fans,
- Electrical and I&C installation of Enclosure and air intake systems.
Generator electrical and I&C assembly work as:
- Generator winding insulation tests,
- Generator excitation isolation tests,
- Electrical connections of blow-off motors,
- Installation of generator instruments and loop controls.