OMV Samsun Natural Gas Combined Power Plant Boiler Modification

OMV Samsun Natural Gas Combined Power Plant Boiler Modification
Employer:
OMV
Reference Place:
Samsun
Date of Contract:
2013
Reference Scope:
The modification works in the boiler produced by Doosan at OMV Samsun Natural Gas Combined Cycle Power Plant with 870 MW power have been completed successfully. The works are as follows: > Cutting center baffle plates between the serpentine pipes in the Unit 2 boiler,> Preparation for the replacement of the cut baffle plates,> Cutting of the new baffle plates according to the assembly procedures,> Assembly and welding of the prepared plates,> supply of fully equipped tool containers.