Baymina Power Plant Maintenance Works

Baymina Power Plant Maintenance Works
Employer:
Baymina Energy
Reference Place:
Ankara
Date of Contract:
2011
Reference Scope:
The planned stop of the 775 MW Ankara Baymina Power Plant in October 2011 was completed with a team of 225 people and the units were commissioned without any problems. HRSG 1 and HRSG 2 LP Evaporator Outlet line 234 bend replacement; Thermocouple calibration was done with 225 pressure temperature switches and transmitters.