Baymina Energy Planned maintenance works for the Ankara Natural Gas Power Plant with 775 MW power were completed in October 2010.
Baymina Energy Ankara Natural Gas Power Plant with 775 MW power was completed in 2005 with planned maintenance.
Baymina Energy Ankara Natural Gas Power Plant with 775 MW power has been completed in 2007 with planned maintenance.
Baymina Energy Ankara Natural Gas Power Plant with 775 MW power has been completed in 2008 with planned maintenance.
The planned stop of the 775 MW Ankara Baymina Power Plant in October 2011 was completed with a team of 225 people and the units were commissioned without any problems. HRSG 1 and HRSG 2 LP Evaporator Outlet line 234 bend replacement; Thermocouple calibration was done with 225 pressure temperature switches and transmitters.
At Baymina Power Plant, the works we have completed with our 290-person team within the scope of planned maintenance;
Major maintenance of the 48,000-hour steam turbine and equipment at the 775 MW Ankara Natural Gas Combined Cycle Power Plant owned by Baymina Energy, which we provide continuous maintenance services, was carried out by Baymina and TurboCare.
Baymina Energy, which we provide continuous maintenance services, has successfully completed 24.000 hours of maintenance and commissioning works under the supervision of Baymina and Alstom company in the steam turbine and generator of 775 MW Ankara Natural Gas Power Plant.
27 MW Siemens NK-5080 type steam turbine and generator C maintenance works have been completed under the supervision of Siemens and Ataer Energy at Ataer Enerji Elektrik Üretim AŞ Power Plant.
Ali Metin Kazancı Antalya Natural Gas Combined Cycle Power Plant, owned by AKSA Energy with a capacity of 850 MW. unit, Siemens SGT5-4000F gas turbine Hot Gas Path B maintenance work; gas turbine, electric I&C, cushion insulation dismantling-assembly, welder and sandblasting teams with Siemens supervised. The unit is switched on smoothly.