Minor maintenance (B maintenance) works at the 478 MW natural gas combined cycle power plant of Trakya Elektrik Üretim ve Ticaret A.Ş. were completed without any problem under the supervision of Siemens and Trakya Elektrik. The scope of maintenance is as follows
Within the scope of maintenance works of 480 MW natural gas combined cycle power plant of Trakya Elektrik in Marmara Ereğlisi, 2 Siemens gas turbines and 1 steam turbine maintenance works were completed under the supervision of Siemens.
Manisa Selkasan A.Ş. Sand blasting of 4.7 MW steam turbine rotor, fixed blades and other equipment of Siemens with glass sand is delivered in desired surface quality.
Alstom supervised the dismantling-assembly, coupling, disassembly-coupling and post-assembly run-out of fan hubs within the scope of renewing retaining rings of 2 150 MW Marelli generators in EÜAŞ SOMTES (Seyitömer Thermal Power Plant).
57 MW Alstom Gas Turbine GT8C2 major maintenance was completed under the supervision of Alstom.
The maintenance of 1 60 MW steam turbine C was completed under the supervision of Alstom in Petkim. In the other 25 MW turbine, turbine rotor and generator stator replacement works have been completed successfully.
The modification works in the boiler produced by Doosan at OMV Samsun Natural Gas Combined Cycle Power Plant with 870 MW power have been completed successfully. The works are as follows:
Within the framework of a maintenance contract with Siemens Turkey in Izmir Tire Kutsan 8 MW steam turbine power plant was completed with great care Siemens company supervisors.
Inspection works carried out by Mitsubishi Company on 2 F4 type gas turbines with 303 MW of Bandırma power plant were completed under the supervision of MHI.
Bandırma Power Plant B maintenance works and modification works of GT1 and GT2 enclosure of 2 F4 type gas turbines with 303 MW were completed under the supervision of Mitsubishi Company.