The installation of 12.4 MW NKS50 / 72/72 type steam turbine in Hangzhou brand at Uğur Energy Çerkezköy Power Plant was completed.
Our company realizes the installation of different lifting tonnages in accordance with EN 1090-2 standards. We also carry out crane tests and certify dynamic and static loads under the supervision of TÜV Rheinland authorized personnel in accordance with the ‘Occupational Health and Safety Regulation ile with our lifting test equipment.
Within the scope of the contract signed with Metka & Power Projects, Denizli 775 MW Combined Cycle Power Plant water treatment plant, waste water treatment plant, condensate polishing plant, oil separators, sanitary system and building overhead crane assembly works have been completed.
Employer: Enka Power Reference Place: Russia-Sakhalin Contract Date: 2008 Reference Scope: Workforce support was provided for the oil pipeline installation works of the oil processing plants in Russia-Sakhalin for Enka Power.
Enka Power provided labor support to the pipeline installation of oil processing facilities in Sakhalin, Russia.
As contractor of ENKA Teknik Company, we have completed all mechanical, electrical and gauge control works of Siemens ZwTina Power Plant 2 × 285 MW Siemens SGT5-4000F gas turbines, auxiliary equipments within Siemens scope and chimney assembly works not covered by Siemens.
The installation of 2 x 600 MW thermal power plant belonging to İçdaş company and 4 Hyosung main circulation pumps with 31,500 m3 / h capacity have been completed.
Mechanical and electrical installation of two 33,000 m3 / h Hysoung brand sea water cooling pumps have been completed at Ambarlı Fuel-Oil Plant.
RWE-Turcas, Denizli 775 MW Combined Cycle Power Plant project, 2 Siemens SGT5-4000F Gas Turbines, Generators, Auxiliary Systems, air intake and 1 SST5-5000 Steam Turbine-Generator, Auxiliary Systems within the scope of the agreement signed with METKA & Power Projects. The mechanical assembly was completed under the supervision of Siemens and Metka & Power Projects.
BOTAS Baku – Tbilisi – Ceyhan Petroleum Pipeline Project Directorate Kars Posof PT 1 Erzurum Pasiner PT 2 Erzincan Cayirli PT 3 Sivas Ulas PT 4 stations electrical installation and commissioning work has been completed.