LP1-LP2 major, HP and generator minor maintenance work in the 660MW Siemens steam turbines at the Isken-Sugözü power plant has been successfully completed in Siemens supervision.
Maintenance work:
- LP1-LP2 rotor dismantages, assemblies
- LP1-LP2 sandblasting Works
- LP1-LP2 rotations
- LP1-LP2 blade carrier Case Sandings
- LP1-LP2 NDT Studies
- LP1 Blade Carrier Ring replacement
- LP2 Blade Carrier Ring replacement
- LP1-LP2 outer casing Maintenance
- Cleaning and maintenance of general turbine parts and connection equipment
- Turbine bump Check Tests
- Conducting the Generator boroscope observation study
- Dismantation of Generator bushingers, and change
As part of the framework contract with Siemens Turkey, our maintenance support services for all Siemens turbines and equipment in Turkey are ongoing.