ENKA Construction and Industry Inc. for West Qurna-2 Project Our works within the scope of the contract signed with;
- Installation of 3 pieces 42MW General Electric MS6001B DLN Fuel Gas Turbine + Load Gear + Generator and all auxiliary systems
- 3 pieces 36m chimney installation,
- Installation of 3 Filter House
- 3 pieces of Lube Oil & Water Cooler installation,
- 3 Atomizing Air Cooler assemblies,
- 3 Local Control Cabinet (LCC) installations,
- Installation of Fuel Gas Compressors and their auxiliary equipment such as Enclosure, Piperack, Air & Water Coolers,
Completed under the supervision of GE and ENKA.
Pre-Commissioning and Commissioning for the West Qurna-2 Project;
- Sözleşme kapsamında montajı yapılan 3 adet 42 MW GE MS6001B DLN Gas Turbine + Load Gear + Generator ve yardımcı sistemlerinin tüm soğuk ve sıcak devreye alma işlemleri ENKA POWER ekibi süpervizörlüğünde tamamlanmıştır.