Siemens Industry and Trade Inc. and our company signed a contract for mechanical erection works of 600 MW Bandırma II CCPP project. This project, which Siemens A.Ş. will perform as EPC, is the second largest project in Turkey to use the SGT5-8000H gas turbine.
Our project scope:
- TurboSet Group assembly: 1Xsıemens SGT5-8000 H gas turbine assembly, 1Xsıemens SGen5-3000W generator and 1Xsıemens SST5-5000 steam Turbine installation (Simple Cycle)
- Air intake system and diffuser installation
- Fuel Gas Compressor Station Installation
- Water-steam cycle power plant, system and components installation
- Installation of HVAC system (UMC, UGX, ULX, UAB)