Employer:
Enka
Reference Place:
İzmir
Date of Contract:
2011
Reference Scope:
In the 2 × 770 MW Enka İzmir Natural Gas Combined Cycle Power Plant, where we have been providing maintenance services and the services provided to the power plant under the supervision of Enka since 2003 >Maintenance of pumps, valves and all auxiliary systems with steam turbine and generator> Maintenance of boilers Cooling water circulation pumps and boiler feed water pumps maintenance> Cleaning of condensers with pressurized water> Sandblasting of steam turbine equipment> Maintenance of rotary equipment in BOP> Electrical and I&C General maintenance services> NDT support services> Preparation of silicon filter and connection pipes to be installed in the RMS station> Work scaffolding and isolation services in the entire field Our work has been completed with 225 managers and other personnel.