Bursa Orhaneli Power Plant Steam Turbine Major Maintenance

Bursa Orhaneli Power Plant Steam Turbine Major Maintenance
Employer:
Siemens
Reference Place:
Bursa Orhaneli
Date of Contract:
2012
Reference Scope:
Bursa Orhaneli Thermal Power Plant 210 MW K210-130 LMZ Steam Turbine maintenance works have been completed under the supervision of Siemens. The tasks are as follows:> HP / IP turbine disassembly> HP / IP casing steam inlet / outlet pipes disassembly> HP / IP / LP turbine rotor sandblasting> HP / IP turbine casing sandblasting> Maintenance of HP / IP turbine bearings> HP / IP spikes shut-off valve and servo motor maintenance installation> Maintenance of HP / IP valves,> Maintenance of LP turbines and bearings> Main oil pump maintenance> Disassembly of pedestals 1 and 2> Spindle treatment with IP instant shut-off valve> IP shut-off valve sit and diffuser surface Exercise> Surface Exercise on HP Instant Shutoff Valve Seats and Diffusers> Surface Exercise between LP Turbine Fixed Blade Bearing Flange Surfaces> Insulation Dismantling and Assembly> Turbine Rotor and Other Parts with Glass Ball> Work Scaffolding Disassembly-Assembly