Siemens
:
Antalya
:
2013
:
Ali Metin Kazancı Antalya Natural Gas Combined Cycle Power Plant owned by 850 MW AKSA Energy. Siemens SGT5-4000F gas turbine major maintenance (C maintenance) works; gas turbine, electrical I&C, cushion insulation, enclosure, welder and sandblasting teams under the supervision of Siemens and Aksa Energy. Maintenance work:> GT rotor disassembly-assembly,> GT, turbine side 1-2-3-4. Renovations of fixed and movable blades,> Sandblasting of external casings and casings studs,> Assembly and disassembly of external casing insulation pads,> Electrical, measurement and maintenance works,> Gas turbine enclosure disassembly and assembly works.