To provide heat and sound insulation of turbines:
Turbine valves are insulated by spray isolation and high pressure, medium pressure stages are carried out by our expert staff and supervisors of G + H Isolierung GmbH Germany. In our application, spray isolation machine and isolation container are used. Insulation materials (rock wool for plaster insulation, plaster, etc.) do not contain asbestos and carcinogenic substances, and personal protective equipment is kept at the highest level during occupational health and safety. We have completed spray insulation works:
Eüaş Afşin-Elbistan A Power Plant 4. unit 340 MW Alstom steam turbine spray insulation (2012)
Spraying insulation of 2 × 110 MW steam turbines and valves within the scope of Ambarlı Fuel-Oil Power Plant Rehabilitation Project (2012)
Tunçbilek Thermal Power Plant 150 MW steam turbine and valves spray isolation (2010)
Enka İzmir Power Plant C maintenance of 2 × 278 MW steam turbines and valves spray isolation (2009)
Spray isolation of 3 × 278 MW steam turbines and valves within the scope of C maintenance of Enka Adapazarı-Gebze Power Plants (2008)
Also,
Cushion insulation installation works for gas turbines and steam turbines:
Ambarlı Rehabilitation Project 2 × 285 MW Siemens SGT5-4000F gas turbines cushion insulation,
RWE Denizli 775 MW Combined Cycle Power Plant Project 2 × 285 MW Siemens SGT5-4000F gas turbine cushion isolation
In addition to gas and steam turbine insulation works
Steam line pipe isolation,
Boiler isolation
also serves in the fields.