The 50 MW steam turbine maintenance at Adana Enerjisa Power Plant was completed under the supervision of Siemens and Enerjisa with our turbine, generator and valve team.
Within the scope of the rehabilitation works of Ambarlı Fuel-Oil Power Plant, 2 + 2 Escher Wyss steam turbines and valves spray isolation works were completed under the supervision of G + H.
Major maintenance (C maintenance) works of Siemens SST-400 type steam turbine and generator in AES ENTEK Elektrik Üretim AŞ facilities with 37 MW power have been completed under supervision of Siemens and AES Entek. Our scope of maintenance is as follows
Within the framework of Adana maintenance contract with Siemens Turkey Enerjisa Power Plant of 50 MW steam turbine it has been completed with great care Siemens company supervisors.
EPP (Ekon, Prokon engineering, Prokon manufacturing) joint venture realized by Ambarlı Fuel-Oil Station 4th and 5. Mechanical, electrical and I&C and air intake works of Siemens 2 x 285 MW SGT5-4000F type gas turbines and generators within the scope of conversion and renewal of units to dual fuel combined cycle power plant have been completed by our company under the supervision of Siemens and EPP.
At the Ankara Esenboğa Power Plant owned by Ankara Enerji Üretim AŞ, 40 MW Natural Gas Power Plant generator, pump, cooling system building and boiler energy supply, panel and installation works, condenser pumps were supplied.
Ali Metin Kazancı Antalya Natural Gas Combined Cycle Power Plant, owned by AKSA Energy with a capacity of 850 MW. unit, Siemens SGT5-4000F gas turbine Hot Gas Path B maintenance work; gas turbine, electric I&C, cushion insulation dismantling-assembly, welder and sandblasting teams with Siemens supervised. The unit is switched on smoothly.
BOTAS Baku – Tbilisi – Ceyhan Petroleum Pipeline Project Directorate Kars Posof PT 1 Erzurum Pasiner PT 2 Erzincan Cayirli PT 3 Sivas Ulas PT 4 stations electrical installation and commissioning work has been completed.
Major maintenance of the 48,000-hour steam turbine and equipment at the 775 MW Ankara Natural Gas Combined Cycle Power Plant owned by Baymina Energy, which we provide continuous maintenance services, was carried out by Baymina and TurboCare.
The maintenance work of the Siemens brand steam turbine with a capacity of 30 MW at Camiş Elektrik Üretim C.O
General Electric gas tube major maintenance works at Ova Elektrik 250 MW combined cycle power plant were completed under Ova Elektrik and GE supervision. The works are as follows