As the subcontractor of EKON Company, our turnkey electromechanical assembly works of gas turbines, steam turbines and generators and auxiliary equipments were completed in 850 MWe Gebze Yeni Elektrik Üretim AŞ Power Plant under the supervision of Ansaldo Energia.
Our installation scope:
- Installation of 2 294MW Ansaldo Energia v94.3a (4) model gas turbines and generators and auxiliary systems, including air intake system and fogging system 1 Ansaldo Energia RT 30 C model steam turbine and generator and auxiliary equipments
- Diffuser assembly
- All gas turbine piping
- Installation of gas turbine and steam turbine generator rotors
- LP turbine field installation
- Gas turbine drain piping
- Sources of main steam lines valves P91
- Lube oil, lube oil cooler, hydraulic oil, lifting oil, pneumatic system and HcO skid installation
- Gas turbine and steam turbine cushion insulation
- Steam turbine valves cushion isolations
- Commissioning works
- Gas turbine commissioning service
- Steam turbine commissioning service
- Operation support service with Ekon C.O
- Commissioning for waste water and chemical dosing unit
- Gas turbine flushing operations Fin fan temporary piping works
- Cleaning of gas turbine and steam turbine lube oil lines
- Installation of HP and IP valves after steam blow works and steam turbine steam blow
- Dosing and sampling activities during commissioning of the units
- Disassembly and assembly works for calibration of all safety valves in the system
- Support for the creation of spare part lists of the valves in the whole system
- All electrical termination of all electrical lines in the interior up to the panels
- Enclosure sealing tests and door fan testing
- With the long-term maintenance agreement (LTSA) signed in 2014, our company provides technical maintenance support to Yeni Elektrik A.Ş Power Plant.
Together with the Gebze Yeni Elektrik Üretim AŞ Power Station, since the year of our establishment in 2002, the stations that we assemble and do;
- Electro-mechanical turnkey installation of 570 MW Libya Zwitina Power Plant as subcontractor of ENKA TEKNİK,
- 570 MW Ambarlı Fuel-Oil Plant as a subcontractor of PROKON-EKON 4th and 5th Electro-mechanical turnkey installation of gas turbines and auxiliary equipments within the scope of rehabilitation project of groups,
- As a subcontractor of METKA, 775 MW DENİZLİ RWE-TURCAS Natural Gas Combined Cycle Power Plant gas turbines and steam turbine groups turn-key mechanical installation,
- As the subcontractor of EKON Company, we undertake the electro-mechanical turnkey installation of 850 MWe Gebze Yeni Elektrik Üretim AŞ Power Plant Natural Gas Combined Cycle Power Plant with the total installed capacity of 2.740 MW power plant turbine groups and auxiliary systems.