{"id":1057,"date":"2019-07-24T17:48:40","date_gmt":"2019-07-24T14:48:40","guid":{"rendered":"https:\/\/protermenerji.com\/uni-mar-power-plant-major-maintenance-studies\/"},"modified":"2019-07-25T19:45:41","modified_gmt":"2019-07-25T16:45:41","slug":"uni-mar-power-plant-major-maintenance-studies","status":"publish","type":"post","link":"https:\/\/protermenerji.com\/?p=1057&lang=en","title":{"rendered":"Uni-Mar Power plant Major Maintenance Studies"},"content":{"rendered":"\n<p>GT13E2 ALSTOM Gas turbine and 1 Alstom steam turbine major maintenance work were completed under the supervision of Unimar and Alstom with our team of 277 people in Unimar Enerji Investments A.\u015e. power Plant\/Marmara Ere\u011flisi with total installed power of 480 MW.<\/p>\n\n\n\n<p>The maintenance scope is as follows:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>GT2 Combustion chamber dismantation and maintenance, installation<\/li><li>The dismantation and maintenance of GT2 burners with a new replacement and installation<\/li><li>Combustion Chambers Ceramic dismantation and replacement of the necessary ones<\/li><li>GT2 Rotor dismant,<\/li><li>Changing the wings of the turbine side required stages<\/li><li>Renewal of the blades of the required stages of the compressor side<\/li><li>GT2 Exhaust Diffuser Unit Renewal<\/li><li>Compressor vane carrier (CVC), turbine vane carrier (TVC) dismantings, cleaning and installation<\/li><li>Dismantling, maintenance and installation of the IGV Blades<\/li><li>Maintenance and installation of fixed blades and labyrinths<\/li><li>ST LP Rotor Disassembly<\/li><li>ST HP\/IP Rotor Disassembly<\/li><li>Steam turbine to sand the HP\/LP rotors<\/li><li>ST-GT2-generators oil sealing gland disassembly, labyrinth measures, maintenance<\/li><li>Generator opening of manhole covers and performing stator inspection with Videoscope<\/li><li>GT2 insulation and stone wool dismantation and erection<\/li><li>Scaffolding works<\/li><li>BOP jobs (Maintenance of various pumps and valves).<\/li><li>ST valve dismantling and assembly activities<\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"GT13E2 ALSTOM Gas turbine and 1 Alstom steam turbine major maintenance work were completed under the supervision of Unimar and&hellip;","protected":false},"author":1,"featured_media":943,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[82],"tags":[102,62],"class_list":["post-1057","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-power-plant","tag-uni-mar"],"acf":[],"_links":{"self":[{"href":"https:\/\/protermenerji.com\/index.php?rest_route=\/wp\/v2\/posts\/1057","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/protermenerji.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/protermenerji.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/protermenerji.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/protermenerji.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1057"}],"version-history":[{"count":2,"href":"https:\/\/protermenerji.com\/index.php?rest_route=\/wp\/v2\/posts\/1057\/revisions"}],"predecessor-version":[{"id":1282,"href":"https:\/\/protermenerji.com\/index.php?rest_route=\/wp\/v2\/posts\/1057\/revisions\/1282"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/protermenerji.com\/index.php?rest_route=\/wp\/v2\/media\/943"}],"wp:attachment":[{"href":"https:\/\/protermenerji.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1057"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/protermenerji.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1057"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/protermenerji.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1057"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}