{"id":1037,"date":"2019-07-24T17:39:21","date_gmt":"2019-07-24T14:39:21","guid":{"rendered":"https:\/\/protermenerji.com\/trakya-electricity-generation-inc-maintenance-work\/"},"modified":"2019-07-25T19:41:23","modified_gmt":"2019-07-25T16:41:23","slug":"trakya-electricity-generation-inc-maintenance-work","status":"publish","type":"post","link":"https:\/\/protermenerji.com\/?p=1037&lang=en","title":{"rendered":"Trakya Electricity Generation Inc. maintenance work"},"content":{"rendered":"\n<p>Siemens supervision of 2 \u00d7 154 MW S\u0131EMENS V 94.2 gas turbines and 1 \u00d7 182 MW ST-1 steam turbine minor maintenance work (investigation of GT combustion chambers, the opening of steam turbine bearings and other minor maintenance works<\/p>\n\n\n\n<p>Technical workforce support for studies under Trakya Elektrik<\/p>\n\n\n\n<p>Boiler Feed water pumps located in CT-1A (11) and CT-1B (12) units, the dismantling, installation and coupling settings of the electric drive units (WEST\u0131NGHOUSE)<\/p>\n\n\n\n<p>Checking the coupling control of the BOP pumps on the field and comparing it with the old data<\/p>\n\n\n\n<p>Dismantation of Valves on HP drums belonging to both boilers, periodic maintenance and reassembly of the workshop<\/p>\n\n\n\n<p>High pressure water cleaning of heat exchanger plates on the condenser line<\/p>\n\n\n\n<p>Performing all surface preparation procedures for replica and hardness measurements on the main steam lines of both boilers<\/p>\n\n\n\n<p>Detailed cleaning of air intake filter modules and air intake system bottom part <\/p>\n\n\n\n<p>In the facilities of 478MW Trakya Elektrik Imalat A.\u015e., minor maintenance works were completed under the supervision of Trakya Elektrik and Siemens.<\/p>\n","protected":false},"excerpt":{"rendered":"Siemens supervision of 2 \u00d7 154 MW S\u0131EMENS V 94.2 gas turbines and 1 \u00d7 182 MW ST-1 steam turbine&hellip;","protected":false},"author":1,"featured_media":955,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[82],"tags":[89],"class_list":["post-1037","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-trakya-electricity-production"],"acf":[],"_links":{"self":[{"href":"https:\/\/protermenerji.com\/index.php?rest_route=\/wp\/v2\/posts\/1037","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/protermenerji.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/protermenerji.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/protermenerji.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/protermenerji.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1037"}],"version-history":[{"count":2,"href":"https:\/\/protermenerji.com\/index.php?rest_route=\/wp\/v2\/posts\/1037\/revisions"}],"predecessor-version":[{"id":1274,"href":"https:\/\/protermenerji.com\/index.php?rest_route=\/wp\/v2\/posts\/1037\/revisions\/1274"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/protermenerji.com\/index.php?rest_route=\/wp\/v2\/media\/955"}],"wp:attachment":[{"href":"https:\/\/protermenerji.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1037"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/protermenerji.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1037"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/protermenerji.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1037"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}