Uni-mar Enerji Santrali Major Bakım Çalışmaları

Unimar Enerji Yatırımları A.Ş., with a total installed capacity of 480 MW the major maintenance works of the GT13E2 ALSTOM gas turbine and 1 Alstom steam turbine at the Power Plant / Marmara Ereğlisi were completed under the supervision of Unimar and Alstom with our team of 277 people.

The scope of maintainance is as follows:

  • GT2 combustion chamber disassembly and maintenance, installation
  • Replacement and disassembly of GT2 burners with new ones
  • Combustion chambers ceramic disassembly and replacement of required ones
  • GT2 rotor disassembly
  • Turbine side replacement of the required steps
  • The side of the compressor is replaced by the required steps.
  • Renewal of the GT2 Exhaust Diffuse
  • Compressor vane carrier (CVC), turbine vane carrier (TVC) disassembly, cleaning and assembly
  • Disassembly, maintenance and installation of IGV blades
  • Disassembly and installation of fixed blades and labyrinths
  • ST LP Rotor disassembly
  • ST HP / IP Rotor disassembly
  • Steam turbine HP / LP rotors blasting
  • ST-GT2-Generator oil seal gland disassembly, labyrinth measurement, maintenance
  • Opening of manhole covers of generators and stator inspection with videoscope
  • GT2 insulation sheet and stone wool disassembly and assembly
  • Scaffolding works
  • BOP works (maintenance of various pumps and valves).
  • ST valve disassembly and assembly activities