Uni-mar Enerji Santrali Major Bakım Çalışmaları
Unimar Enerji Yatırımları A.Ş., with a total installed capacity of 480 MW the major maintenance works of the GT13E2 ALSTOM gas turbine and 1 Alstom steam turbine at the Power Plant / Marmara Ereğlisi were completed under the supervision of Unimar and Alstom with our team of 277 people.
The scope of maintainance is as follows:
- GT2 combustion chamber disassembly and maintenance, installation
- Replacement and disassembly of GT2 burners with new ones
- Combustion chambers ceramic disassembly and replacement of required ones
- GT2 rotor disassembly
- Turbine side replacement of the required steps
- The side of the compressor is replaced by the required steps.
- Renewal of the GT2 Exhaust Diffuse
- Compressor vane carrier (CVC), turbine vane carrier (TVC) disassembly, cleaning and assembly
- Disassembly, maintenance and installation of IGV blades
- Disassembly and installation of fixed blades and labyrinths
- ST LP Rotor disassembly
- ST HP / IP Rotor disassembly
- Steam turbine HP / LP rotors blasting
- ST-GT2-Generator oil seal gland disassembly, labyrinth measurement, maintenance
- Opening of manhole covers of generators and stator inspection with videoscope
- GT2 insulation sheet and stone wool disassembly and assembly
- Scaffolding works
- BOP works (maintenance of various pumps and valves).
- ST valve disassembly and assembly activities