Employer | : Enka Power |
Reference Location | : Adapazarı |
Contract Date | : 2002 |
Scope of Referenceı | : We provide technical maintenance services for the Adapazarı and Gebze Electricity Natural Gas Combined Cycle Power Plants with atotal capacity of2310 MW installed in the Adapazarı district of Enka Power in2003, within the framework |
CONTACT
Proterm Enerji Sanayi ve Ticaret A.Ş.
Ceyhun Atuf Kansu Cad. Bayraktar İş Merkezi G Blok 114/3 06520 Balgat / ANKARA
Tel: +90 312 472 88 50 - 51
Faks: +90 312 472 88 72
info@protermenerji.com
Ceyhun Atuf Kansu Cad. Bayraktar İş Merkezi G Blok 114/3 06520 Balgat / ANKARA
Tel: +90 312 472 88 50 - 51
Faks: +90 312 472 88 72
info@protermenerji.com