Monsanto Bursa Mustafakemalpaşa Tesisleri Montaj Çalışmaları

Mustafakemalpaşa Facilities were completed by our company under the supervision of Monsanto.

In project scope; 

  •  7 Simatek Z elevator assembly 
  • 16 Cimbria conveyor assembly
  • 14 Tsc Product Silos Installation 
  • Mounting unit 
  • Pre-cleaning unit installation 
  • Installation pool unit Installation 
  • Ventilation Installation 
  • Panel Coating Installation 
0 cevaplar

Cevapla

Want to join the discussion?
Feel free to contribute!

Bir cevap yazın

E-posta hesabınız yayımlanmayacak. Gerekli alanlar * ile işaretlenmişlerdir