In order to provide heat and sound insulation of turbines,

Turbine high pressure process is carried out with spray insulation and turbine valves insulation process is carried out with intermediate-pressure stage by expert staffs of our firm and supervisors of G+H Isolierung GmbH German firm. In the process, spray insulation machines and insulation containers are used. Insulation materials (rock wool, plaster, and etc. for spray insulation) do not contain asbestos and carcinogens and during process, occupational safety and health are kept at the highest level with personal protective equipment. The insulation works that we accomplished are:

EüaşAfşin-Elbistan A Power Station 4th unit 340 MW Alstom steam turbine spray insulation (2012)
Under Ambarlı Fuel-Oil Power Station Rehabilitation Project, 2×110 MW steam turbines and valves spray insulation (2012)
TunçbilekThermal Station 150 MW steam turbines and valves spray insulation (2010)
Under Enka İzmir Power Station maintenance C 2×278 MW steam turbines and valves spray insulation (2009)
Under EnkaAdapazarı-Gebze Power Stations maintenance C, 3×278 MWsteam turbines and valves spray insulation (2008)

In addition,

Our pad insulation installation works for gas turbines and steam turbines are:

Ambarlı Rehabilitation Project 2×285 MW Siemens SGT5-4000F gas turbines pad insulation,
RWE Denizli 775 MWCombined Cycle Power Plant Project 2×285 MW Siemens SGT5-4000F gas turbines pad insulation,

In addition to gas and steam turbine insulation works, our firm gives services also on

Steam lines pipe/tube insulations,
Boiler insulations.

KaydetKaydet

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri

Proje Görselleri