In Enka Adapazarı Gebze Power Plants ,21 Adapazarı Unit 100.000 hours major maintenance
In Enka Adapazarı Gebze Power Plants ,21 Adapazarı Unit 100.000 hours major maintenance works have been completed with a team of 260 people under the supervision of Enka Power, Alstom Power and General Electric.
Completed Works are as follow :
- In the 11X steam turbine unit,
- Generator disassembly and maintenance,
- Disassembly of HP and IP turbine valves and actuators, maintenance in mechanical workshop,
- Installation and disassembly of LP turbine blades,
- Installation of HP and IP turbine blade maintenance work and sealing rings,
- HP and IP stage spray isolation works,
- Main lubrication pump maintenance,
- Main lubrication unit exchangers, filters and pumps maintenance,
- Maintenance and installation of oil cooler pumps and filters
- Disassembly, cleaning and installation of oil cooler plates
- Oil Flushing operation and oil tank drain operation and cleaning,
- Cleaning of condensor with pressure water
- Disassembly and maintenance works of BOP unit and boiler pumps,
- Mekanik atölyede ihtiyaç halinde uygun aparatların imal edilmesi,
- In the 11A Unit, the main maintenance performed by General Electric is provided with gas turbine element support.
- The 11B Unit is equipped with the gas turbine element support from the major maintenance performed by General Electric
- All scaffolding works in the field
- All isolation works in the field