Maintainance of Siemens N6 5 3 MW back-pressure steam turbine and generator in the scope of steam turbine revision in Edi- Maden Bor ve Asit Fabrikaları İşletmesi has been comptede under Siemens supervisorship.

The scopes are as follow:

  • Disassembly of turbine enclosure
  • Disassembly of Turbine damper isolation and numbering
  • Disassembly of turbine lower/ upper casing and maintainance
  • Disassembly of turbine valves and maintainance
  • Disassembly of turbine main lubrication pump group
  • Disassembly of turbine inner side fixed blade
  • Disassembly of turbine rotor
  • Disassembly of turbine all damper, disassembly and maintainance of front pedestal
  • Sanding turbine rotor, fixed blade, lower/upper casing and pin with glass ball
  • Fixing flange surface of turbine main steam outlet pipe with lathe
  • Disassembly and installation of gear box, pinson gear and replacing the big gear and pinyon gear with the new one
  • Smooting the gear box carrier chassis
  • Preventation of Generator , disassembly and maintainance of warning
  • Disassembly of Generator lubeoil line
  • Disassembly of generator damper and pedestals , replacing the damper with the new one
  • Disassembly of generator stor and rotor