Maintainance of Siemens N6 5 3 MW back-pressure steam turbine and generator in the scope of steam turbine revision in Edi- Maden Bor ve Asit Fabrikaları İşletmesi has been comptede under Siemens supervisorship.
The scopes are as follow:
- Disassembly of turbine enclosure
- Disassembly of Turbine damper isolation and numbering
- Disassembly of turbine lower/ upper casing and maintainance
- Disassembly of turbine valves and maintainance
- Disassembly of turbine main lubrication pump group
- Disassembly of turbine inner side fixed blade
- Disassembly of turbine rotor
- Disassembly of turbine all damper, disassembly and maintainance of front pedestal
- Sanding turbine rotor, fixed blade, lower/upper casing and pin with glass ball
- Fixing flange surface of turbine main steam outlet pipe with lathe
- Disassembly and installation of gear box, pinson gear and replacing the big gear and pinyon gear with the new one
- Smooting the gear box carrier chassis
- Preventation of Generator , disassembly and maintainance of warning
- Disassembly of Generator lubeoil line
- Disassembly of generator damper and pedestals , replacing the damper with the new one
- Disassembly of generator stor and rotor