In Enka Adapazarı Gebze Power Plants ,21 Adapazarı Unit 100.000 hours major maintenance
In Enka Adapazarı Gebze Power Plants ,31 Adapazarı Unit 100.000 hours major maintenance works have been completed with a team of 280 people under the supervision of Enka Power, Alstom Power and General Electric The units have been commissioned without any problems
It is structured as follows:
- In the 31X steam turbine unit,
- Disassembly of HP, IP and LP turbines,
- Generator disassembly and maintenance,
- Disassembly of HP and IP turbine valves and actuators, maintenance in mechanical workshop,
- Installation and disassembly of LP turbine blades,,
- Installation of HP and IP turbine blade maintenance work and sealing rings,
- HP and IP stage spray isolation works,
- HP inner casing body modification and steam inlet clean cut process,
- Removing and replacing the IP rotor seal strips,
- Disassembly of blade rows required for IP rotor and turning of blade slots according to new blade design and assembly of new blades,
- NDT studies and reporting after rotor body turning,
- Main lubrication pump maintenance,
- Main lubrication unit exchangers, filters and pumps maintenance,
- Maintenance and installation of oil cooler pumps and filters
- Disassembly, cleaning and installation of oil cooler plates
- Oil Flushing operation and oil tank drain operation and cleaning
- Cleaning of condensor with pressure water
- Disassembly and maintenance works of BOP unit and boiler pumps,
- Manufacturing of suitable apparatus in case of need in mechanical workshop,
- In the 31A Unit, the main maintenance performed by General Electric is provided with gas turbine element support.
- The 31B Unit is equipped with the gas turbine element support from the major maintenance performed by General Electric.
- All scaffolding works in the field
- All isolation works in the field