Monsanto Bursa Mustafakemalpaşa Tesisleri Montaj Çalışmaları

Mustafakemalpaşa Facilities were completed by our company under the supervision of Monsanto. In project scope;   7 Simatek Z elevator assembly  16 Cimbria conveyor assembly 14 Tsc Product Silos Installation  Mounting unit  Pre-cleaning unit installation  Installation pool unit Installation  Ventilation Installation  Panel Coating Installation 

AKSA Akrilik Kimya Kömür Yakıtlı Enerji Santrali Bakım İşleri

Two steam turbines, pumps, fan maintenance, impeller cleaning, NDT controls, coupling settings, vibration measurements and instrument calibrations of the power plant in Yalova Aksa Acrylic Plants have been completed successfully with the supervision of Aksa Acrylic.  Scope of maintenance PA, FD, SA, ID and instrument cooling fan bearing maintenance, bearing changes, measurement controls, impeller cleaning, NDT, vibration measurements, coupling settings and commissioning, KSB feedwater pumps, Andritz circulation pumps, Quencher hydrocyclone pumps disassembly, maintenance and assembly, vibration controls, coupling settings and commissioning,   Instrument calibration works,  75 MW AEG steam turbine valves and bearing maintenance works,  25 MW SKODA steam tube valve and bearing maintenance Works 

930MWe Enerjisa Bandırma I CCPP Major Bakım Çalışmaları

At 930MWe Bandırma Enerjisa I CCPP, Mitsubishi M701F Gas Turbine major maintenance and steam turbine minor maintenance have been successfully completed under the supervision of Enerjisa and Mitsubishi.  The scope of the work; GT noise enclosure and disassembly / assembly of instruments,  GT disassembly / assembly,  Hot gas path maintenance,   Visual inspection and maintenance of combustion chambers, (burner) change of ceramics and nozzles,  Maintenance of gas turbine compressor stage,  Turbine bearings control and maintenance,  Replacement of fixed-moving blades,   Maintenance of oil tanks, oil pumps and oil heat exchangers, oil changes  Dismantling / mounting of generator rotor, dismantling, maintenance and pressure tests of coolers,  Check and maintenance of generator bearings, Generator warning system disassembly / maintenance,  Control, replacement and maintenance of generator stator windings,  Maintenance of generator auxiliary systems,  Steam turbine general valve assembly disassembly and maintenance,  Air Intake unit maintenance and filter replacement  Turbine coupling adjustment, 

1150MW Aksa Ali Metin Kazancı CCPP Major Bakımı

At 1150MW Aksa Ali Metin Kazancı Natural Gas Combined Cycle Power Plant, major maintenance works have been completed under the supervision of Aksa and Siemens.  Scope of maintenance;  Dismantling and assembly with GT noise enclosure instruments, Disassembly / assembly of gas turbine insulation,  Gas turbines rotor and stator maintenance, Visual inspection and maintenance of combustion chambers, replacement of ceramics and nozzles,(burner)  Hot-Gas Path maintenance,   Replacement of fixed-moving blades, Cleaning and sandblasting of the wings, bolts and casing, Control and maintenance of gas turbine bearings, Gas turbine compressor stage maintenance, Steam turbine coupling and bearing maintenance, Honing of steam turbine coupling pin positions,  GT and BT coupling adjustment 

Aksa Acrylic Fan Maintenance Work  

Taking the vibration values of the fans while running and taking the coupling adjustment values before dismantling,   Maintenance of fans and impellers, Installation, coupling adjustment and coupling adjustment after commissioning Plant, fan and pump maintenance and vibration measurements of Aksa Akrilik Kimya Sanayii A.Ş. have been completed under the supervision of Aksa Akrilik. tamamlanmıştır.

Trakya Elektrik Üretim A.Ş. Bakım Çalışması

2 × 154 MW SIEMENS V94.2 Gas Turbines and 1 × 182 MW ST-1 Steam Turbine Minor Maintenance Studies (GT combustion chamber control, opening of steam turbine bearings and other minor maintenance work under supervision of Siemens,  Technical workforce support for the works within the scope of Trakya Elektrik,  Dismantling, assembling and realizing coupling settings of the boiler feed water pumps electrical actuators (WESTINGHOUSE) in the CT-1A (11) and CT-1B (12) units,  Coupling adjustment controls of BOP pumps in the field and comparison with the old data,  Dismantling of valves on HP drums of both boilers, periodical maintenance and reassembly of them in workshop, Realization of all surface preparation processes for replica and hardness measurements on main steam lines of both boilers,  Detailed cleaning of air intake filter modules and the air intake system lower part,  In the facilities of 478MW Trakya Elektrik Üretim A.Ş., minor maintenance works were completed under the supervision of Trakya Elektrik and Siemens.