Employer : Ekon – Prokon Engineering
Reference Place : İstanbul
Date of Contact : 2011
Reference Scope : Mechanical and electrical installation of 2 33,000 m3 / hour Hysoung brand sea water cooling pumps have been completed at Ambarlı Fuel-Oil Plant. In addition, mechanical and electrical installation of 4 Hyosung high pressure turbine boiler feed water pumps with a capacity of 324 m3 / h and 4 medium pressure turbine boiler feed water pumps with a capacity of 90 m3 / h are completed.