Employer | : Metka |
Reference Place | : Denizli |
Date of Contact | : 2011 |
Reference Scope | : Our company realizes the installation of ceiling cranes in different lifting tonnages in accordance with EN 1090-2 standards. In addition, we carry out crane tests and certify dynamic and static loads under the supervision of TÜV Rheinland authorized personnel in accordance with the regulations of the ‘Occupational Health and Safety Regulation’ with our lifting test equipment. In this context, Denizli Turbine Combined Cycle Power Plant project, which is continuing the installation of gas turbines-generators and steam turbines-generators, includes a ceiling crane with hooks of 150 tons, 25 tons and 12.5 tons for the engine room; 2×25 ton roof crane for steam turbine; All electro-mechanical assembly of 1 5-ton ceiling crane for the warehouse building has been made on turn-key basis and delivered by static and dynamic tests with TÜV Inspector. |
CONTACT
Proterm Enerji Sanayi ve Ticaret A.Ş.
Ceyhun Atuf Kansu Cad. Bayraktar İş Merkezi G Blok 114/3 06520 Balgat / ANKARA
Tel: +90 312 472 88 50 - 51
Faks: +90 312 472 88 72
info@protermenerji.com
Ceyhun Atuf Kansu Cad. Bayraktar İş Merkezi G Blok 114/3 06520 Balgat / ANKARA
Tel: +90 312 472 88 50 - 51
Faks: +90 312 472 88 72
info@protermenerji.com